The City of Kalamunda Asset Maintenance Department has had an opportunity to carry out drainage upgrade and asphalt resurfacing of the above location.
Works will commence the week of 15th January 2024 and it is anticipated to be completed mid-March. This timeframe could change, due to contractor availability, weather conditions and work site conditions.
There will be a closure to the Laneway and from 19 Headingly Rd to 27 Headingly Rd during some of the key work components. Please see the attached map which details the area of works, but there will be access for residents only.
There will be traffic control onsite and access to residents to enter and leave their properties.
Properties located adjacent to the proposed works may experience disturbance to the verge, which may include crossovers, reticulation, and lawns. Any such disturbances will be fully reinstated after the completion of the work.
Please be assured that every effort will be made during these works to minimize impact on those who live nearby and to the environment.
Update 05/04/2024
From Wednesday 10 April until Thursday 11 April, Headingly Road will be closed during the day to complete the current roadworks.
Update 11/01/2024
The laneway road will be closed for 4 days from Tuesday 16 January to Friday 19 January inclusive. Traffic management personnel will be onsite to direct traffic as necessary.
There will be two Variable Message Boards (VMBs) installed on either side of the road work to warn road users of the upcoming work, as per the image attached.
No documents attached
For more information, please contact the City on 9257 9999 or enquiries@kalamunda.wa.gov.au